Scoping, AFE development and project execution plans for multiple facility debottlenecking and upgrades.
- Multiple fields – G190A, G147, G193, G194, G141B, G139, WB 133
- Multiple projects – New gas compressors, water handling equipment, micro-turbine generator installations, platform structural modifications (jacket and crane repair, corrosion repair, deck repair, addition of boat landings and helidecks), gas to air service change out, process trouble shooting, MCC modification, field vibration analysis, liquid handling study, well hookups, addition of new quarters, Field Development concept/planning.
|
| ESSO Kizomba |
Topsides specification development & review.
- Deepwater development, offshore Angola
- Surface wellhead platform for drilling, well maintenance and support for full wellstream production to an FPSO
- Fast Track” project completed on time
|
| Exxon Galveston Island GA - 209 |
Conceptual Engineering, development of project schedules and cost estimates for a major facilities expansion which centralized operations and increased gas production by more than 75%.
- Four pile jacket, deck, interconnecting bridges to existing platforms, pipeline commissioning, relocated 42 man quarters building, added compressor
- “Fast Track” project – cumulative downtime of existing platforms = four days
|
| ExxonMobil Santa Ynez Facilities |
Complete scoping, Front End Engineering, PDM and BDM development.
- Replaced / modified separator, shipping pump, water injection system and NGL recovery facilities
- Debottlenecking, added new wells and flowlines
|
| ExxonMobil South Timbalier 54 |
Conceptual Engineering for remote multi-platform redesign required to increase field wide production.
- Four platforms – added multiple new equipment and modified existing facility
- Remote platform redesign scope change from gas to oil – HFG Engineering responded with complete design in two weeks from date of change
- “Fast Track” project completed on time
|
| LOOP Clovelly Crude Handling |
Complete FEED Package including Conceptual and Preliminary Engineering, AFE cost estimates, project plans, and EPIC Bid Packages.
- Added four 600,000 BBL crude oil storage tanks, with all pumps, piping, and ancillary facilities
- $30MM project
- HFG Engineering selected as “vendor of choice” for all capital and expense projects
|
| MEGI Zafiro |
Conceptual engineering, FEED, AFE cost estimates, and development of equipment ITT’s for major modification (addition of Crude Oil Transfer Pumps).
- Addition of three pumps (2500 HP multistage centrifugal with variable speed drives)
- Pumping capacity = 200,000 BPD at 1140 psi
- SOW included complete switchgear / MCC / Control building with 4160V and 480V systems, shell and tube heat exchangers, degasser vessel, lifting equipment, and fire/safety equipment
|
| Mobil 18 “A” |
Conceptual study and AFE cost estimates supporting doubling of production capacity.
- Complete facility upgrade for Green Canyon
|
| MP283, VK-734 Chinook Project |
All facets of FEED package development, Business Plan Development, and Facility Plan Development.
- Greenfield 4,000 ton four pile deck and facilities with tripod remote facility; major facilities design (waste heat recovery, jackets, decks, flowlines, topsides, separation, compression, and produced water treatment)
- IPA assessed FEED as “Best Practical”
- IPA noted FEED “Value Improving Practices” were more than twice industry norm
- Achieved first oil ahead of schedule
- Procured > $25MM in equipment
|
| MPN ABANG |
Conceptual Engineering, evaluation of fast production options, deep high pressure gas reservoirs, intermediate oil reservoirs and shallow producers; final design review.
- Satellite facility to support fast production of Abang wells to existing Usari production platform
|
| MPN QIT Safety Systems Upgrade |
Complete FEED package development included Conceptual Design, Preliminary Engineering, project specifications and EPIC Bid Package.
- Facility in continuous operation for more than 30 years. Modernized facility safety systems.
|
| MPN QIT West Flare Upgrade |
Complete FEED package development for design build of HEA West Flare, included Conceptual and Preliminary Engineering & EPIC Bid Package.
- Facility in continuous operation for more than 30 years. Replaced severely degraded existing flare with smokeless flare system
- Identified and corrected multiple operational and integrity problems that had caused prior degradation.
- Detailed construction oversight minimized downtime of existing facility.
|
| MPN USARI Water Injection Project |
Conceptual Engineering for new pressure maintenance facilities.
- Evaluated freshwater, salt water aquifer injection and traditional seawater injection options (70 – 200 kpd injection rate)
|
| OCN Gas Facilities |
Conceptual and Front End Engineering for gas facilities project, including participation in business and overall facility plan development and development of ITT packages.
- Extra heavy crude oil blended with condensate (to improve flow) – New facilities for gas separation, compression, dehydration, hydrocarbon dew point control, compression metering, and new pipelines.
- Capacity = 204,000 BPD; 32,000 BWPD; 125 MMSCFD.
|
| Schlumberger Dewatering Facility |
Conceptual and Preliminary Engineering for the complete modification and subsequent ABS certification of existing semi-submersible rig.
- Complete modification / refurbishment and ABS certification of existing semi-submersible
- Capacity = 180,000 BLPD
- Client awarded highest recognition based on quality and schedule performance
|
| Texaco Vermillion 379 |
Conceptual and Preliminary Engineering and AFE estimates; fast-track project.
- Major facilities design including retrofit and reuse of salvaged jacket and deck
- Capacity = 7,500 BOPD; 10,000 BWPD; 28 MMSCFD
- Procured >$14MM in equipment
|
| Unocal Beaver Creek Gas Plant |
All facets of FEED package development including Conceptual Engineering, Preliminary Engineering, and cost estimates.
- Greenfield gas plant – SOW included EPIC bid package development
|
| Unocal EB159 and 160 fields |
Complete FEED for subsea tieback and complete facilities upgrade.
- Large scale platform upgrades
- In addition to FEED, also provided facilities training
|
| Williams Energy |
Developed multiple FEED Packages for gas plant enhancements including Conceptual and Preliminary Engineering and development of EPIC Bid Packages.
- Mobile Bay – 9000 BBL Slug catcher and 3500 BPD condensate stabilization system including required flash gas compression and detailed analysis of offshore gathering system to determine design basis
- Markham Gas Plant – Condensate heater replacement
- Cameron Meadows – Thermal oxidizer to handle amine regeneration, gas and vapor recovery compressor to handle flash gas
|